Field | Description |
Level 1 Drilldown
|
In
Level 1 Drilldown under
Project in the table, select the top level of the drill-down hierarchy that employees will use when looking up a UDT02-related charge for a timesheet, expense authorization, or expense report.
For example, if you have multiple Costpoint companies, you might select
Company in
Level 1 Drilldown.
If this is the lowest drill-down level you will use for UDT02-related charge lookups, select
Project Top-Level.
If you do not want to provide drill down at this level, select
None.
In
Level 1 Drilldown under
MO, select the top drill-down level for looking up charges for MO entry. Do the same under
Account for looking up charges that do not require a UDT02.
|
Level 2 Drilldown
|
In
Level 2 Drilldown under
Project in the table, select the second level of the drill-down hierarchy that employees will use when looking up a UDT02-related charge for a timesheet, expense authorization, or expense report.
For example, you might select
Company at level 1 and
Customer at level 2.
If this is the lowest drill-down level you will use for UDT02-related charge lookups, select
Project Top-Level.
If you do not want to provide drill down at this level, select
None.
In
Level 2 Drilldown under
MO, select the second drill-down level for looking up charges for MO entry. Do the same under
Account for looking up charges that do not require a UDT02.
|
Level 3 Drilldown
|
In
Level 3 Drilldown under
Project in the table, select the third level of the drill-down hierarchy that employees will use when looking up a UDT02-related charge for a timesheet, expense authorization, or expense report.
For UDT02-related charge lookup, you must select
Project Top Level for the lowest drill-down level you will use. If you did not select it for level 1 or level 2, select
Project Top Level in
Level 3 Drilldown.
If you do not want to provide drill down at this level, select None.
In
Level 3 Drilldown under
MO, select the third drill-down level for looking up charges for MO entry. Do the same under
Account for looking up charges that do not require a UDT02.
|
Continue Project Structure
|
Select the
Continue Project Structure check box in the table for UDT02-related charge lookup if you want employees to be able to continue drilling down using the levels of the Costpoint UDT02 structure.
Use this option if time and expenses are charged to individual components of a UDT02 rather than simply to the UDT02 as a whole.
|
Min Filter Length (ID)
|
In the Charge Lookup dialog box, you can generate a list of charges using filters on IDs or descriptions. When you do that, you have the option to specify the first few characters of the IDs or descriptions, and the system returns all charges that begin with those characters. (For example, if you enter
10 when filtering by UDT02 ID, the results list would include 1000 and 1010, but not 0100.)
In
Min Filter Length (ID), enter the minimum number of characters a user must enter to use this type of filter for UDT01 or UDT02 IDs on each of the tabs in the Charge Lookup dialog box. (Valid values are 0 - 10.)
|
Min Filter Length (Desc)
|
In the Charge Lookup dialog box, you can generate a list of charges using filters on IDs or descriptions. When you do that, you have the option to specify the first few characters of the IDs or descriptions, and the system returns all charges that begin with those characters. (For example, if you enter
10 when filtering by UDT02 ID, the results list would include 1000 and 1010, but not 0100.)
In
Min Filter Length (Desc), enter the minimum number of characters a user must enter to use this type of filter for charge descriptions on each of the tabs in the Charge Lookup dialog box. (Valid values are 0 - 10.)
|
User Defined Code 1, 2, 3
|
When you add a Costpoint charge to a timesheet, the system also checks for corresponding UDT01s and UDT02s in Time & Expense with ESS. If one of them does not yet exist, it is added automatically. Your selections in User Defined Code 1,
User Defined Code 2, and
User Defined Code 3 control what appears in the
Code 1,
Code 2, and
Code 3 fields in the UDT01 and UDT02 screens for those added records.
- Under
Project, use
User Defined Code 1,
User Defined Code 2, and
User Defined Code 3 to select the type of data to be assigned to
Code 1,
Code 2, and
Code 3 for any UDT02s added for UDT02-related charges.
- Under
MO, use these fields to select the type of data to be assigned to
Code 1,
Code 2, and
Code 3 for any UDT02s added for MO-related charges.
- Under
Account, use these fields to select the type of data to be assigned to
Code 1,
Code 2, and
Code 3 for any UDT01s added for UDT01-only charges.
|
Create Owning Role
|
When you add a Costpoint charge to a timesheet, the system also checks for corresponding UDT01s and UDT02s in Time & Expense with ESS. If one of them does not yet exist, it is added automatically.
Create Owning Role controls whether supervisor information is set up for the added records.
Note: The supervisor information is only used for charge security and line-level approval. If you are not using these features, you do not need to check
Create Owning Role.
- Under
Project, check
Create Owning Role if you want Time & Expense with ESS to include supervisor information for any UDT02s added for UDT02-related charges.
- Under
MO, check
Create Owning Role if you want to include supervisor information for any UDT02s added for MO-related charges.
|
Description
|
In
Description under
Project and
MO, select what you want to appear as the description at the charge level in the Charge Lookup dialog box.
For UDT02-related charges, select
Top/Bottom if you want the charge description to be a combination of the UDT02's top structural level and the lowest level. Select
Bottom if you want the description to be just the the lowest level of the UDT02 structure.
For MO-related charges, your options are
MO ID,
Build Project, or
Part Number.
|